Green Stormwater Infrastructure Plans PDF (43 pages) - All plans in one file
|
Filename |
Description |
Date |
GSI-01a |
BMP L613 Post Construction Soil Quality and Depth Option 1 – No Disturbance
|
4/4/2016 |
GSI-01b |
BMP L613 Post Construction Soil Quality and Depth Option 2 – Amend in Place
|
4/4/2016 |
GSI-01c |
BMP L613 Post Construction Soil Quality and Depth Option 3 – Stockpile and Amend
|
4/4/2016 |
GSI-01d |
BMP L613 Post Construction Soil Quality and Depth Option 4 – Imported Topsoil
|
4/4/2016 |
GSI-02 |
Observation / Monitoring Ports for Stormwater Facilities |
4/4/2016 |
GSI-03a |
Bioretention Section |
4/4/2016 |
GSI-03b |
Bioretention Section with Underdrain |
4/4/2016 |
GSI-03c |
Bioretention Section with Liner and Underdrain |
4/4/2016 |
GSI-04 |
Bioretention Transition Zone Sections |
4/4/2016 |
GSI-05a |
Bioretention with Sloped Sides and Sloped Bottom Plan and Longitudinal Section
|
4/4/2016 |
GSI-05b |
Bioretention with Sloped Sides and Level Bottom Plan and Longitudinal Section
|
4/4/2016 |
GSI-06a(1) |
Walled Bioretention with Parking – Plan View |
4/4/2016 |
GSI-06a(2) |
Walled Bioretention with Parking – Section View |
4/4/2016 |
GSI-06b(1) |
Walled Bioretention without Parking – Plan View |
4/4/2016 |
GSI-06b(2) |
Walled Bioretention without Parking – Section View |
4/4/2016 |
GSI-06c(1) |
Walled Bioretention for Building Downspouts Plan View |
4/4/2016 |
GSI-06c(2) |
Walled Bioretention Section View |
4/4/2016 |
GSI-06c(3) |
Walled Bioretention Section View |
4/4/2016 |
GSI-06c(4) |
Bioretention Planter Adjacent to Building – Section View |
4/4/2016 |
GSI-06c(5) |
Bioretention Planter Adjacent to Building – Section View |
4/4/2016 |
GSI-06d |
Walled Bioretention Walls and Structural Footing |
4/4/2016 |
GSI-06e |
Walled Bioretention Structural Buttress / Weir |
4/4/2016 |
GSI-07 |
Curb Bulbout Bioretention with Sloped Sides |
4/4/2016 |
GSI-08 |
Bulbout (In-line) Curb Cut |
4/4/2016 |
GSI-09a |
Curb Cut for Facility with Graded Side Slopes |
4/4/2016 |
GSI-09b |
Curb Cut at Walled Facility |
4/4/2016 |
GSI-10a |
Inlet Trench Drain into Sloped Facility |
4/4/2016 |
GSI-10b |
Trench Drain into Walled Bioretention |
4/4/2016 |
GSI-11a |
Stormwater Sediment Forebay with Concrete Trough |
4/4/2016 |
GSI-11b |
Stormwater Energy Dissipator with Piped Inlet |
4/4/2016 |
GSI-12 |
Presettling Cell with Pipe or Curb Cut |
4/4/2016 |
GSI-13 |
Overflow Outlet Structure |
4/4/2016 |
GSI-013 |
Rain Garden Piped Inlet |
9/1/2016 |
GSI-14 |
Overflow Outlet Structure for Smaller Facilities |
4/4/2016 |
GSI-15 |
Green Stormwater Infrastructure Outlet Control |
4/4/2016 |
GSI-16 |
Boulder Weir |
4/4/2016 |
GSI-17 |
Permeable Pavement Overflow Infiltration Gallery |
4/4/2016 |
GSI-18 |
Green Stormwater Infrastructure Edge Treatment |
4/4/2016 |
GSI-19 |
Paved Surface Sheet Flow to Stormwater Facility |
4/4/2016 |
GSI-20a |
Planting Zone Diagram Bioretention with Side Slopes |
4/4/2016 |
GSI-20b |
Planting Zone Diagram Bioretention with Vertical Walls |
4/4/2016 |
GSI-21a |
Tree Planting on Bioretention Cell Edge Adjacent to Sidewalk |
4/4/2016 |
GSI-21b |
Tree Planting in Bioretention Cell Edge Adjacent to Curb |
4/4/2016 |