East Portland Avenue Safety Improvements

This Web Page is Available in 100+ Languages

Need this web page translated? 需要翻译此页面吗? ត្រូវការបកប្រែភាសាគេហទំព័រនេះមែនទេ? 이 웹페이지의 번역이 필요하십니까? Хотите перевести эту страницу? ¿Necesita traducir esta página web? Kailangan isalin ang pahina sa web na ito? Bạn cần dịch trang web này? 

 

 

How to Translate this Web Page

Need this web page translated? Please use the ‘Language’ button above to translate this page into one or more of 100 languages available. 需要翻译此页面吗?请使用上方的“语言”按钮,将此页面翻译成一种或多种语言,总计支持100种语言翻译。 ត្រូវការបកប្រែភាសាគេហទំព័រនេះមែនទេ? សូមប្រើប៊ូតុង 'ភាសា' ខាងលើដើម្បីបកប្រែភាសាទំព័រនេះជាភាសាមួយ ឬច្រើនជាង 100 ភាសាដែលអាចប្រើបាន។  이 웹페이지의 번역이 필요하십니까? 위의 ‘Language’ 버튼을 이용해 100여 개 언어 중 하나로 이 페이지를 번역할 수 있습니다.   Хотите перевести эту страницу? Воспользуйтесь кнопкой "Язык" выше, чтобы перевести эту страницу на один или несколько из 100 предложенных языков   ¿Necesita traducir esta página web? Utilice el botón “Idioma” de arriba para traducir esta página a uno o más de los 100 idiomas disponibles.   Kailangan isalin ang pahina sa web na ito? Mangyaring gamitin ang pindutan na ‘Wika’ sa itaas upang isalin ang pahinang ito sa isa o higit sa 100 wika na magagamit.   Bạn cần dịch trang web này? Vui lòng sử dụng nút ‘Ngôn ngữ’ ở trên để dịch trang này sang một hoặc nhiều thứ tiếng trong số 100 ngôn ngữ sẵn có.

 

 

Project Background

East Portland Avenue is a major arterial that provides the main north-south access in the southeast quadrant of Tacoma. It is parallel to State Route (SR) 7/Pacific Avenue and provides critical alternate capacity/access from/to Interstate 5 and SR-512. East Portland Avenue currently has four through lanes and a center two-way left turn lane for much of its length. Sidewalks are provided on both sides of East Portland Avenue which accommodate non-motorized travel. Pierce Transit operates Route 41 along the corridor and it carries approximately 267,000 riders annually. Developed sites are a mix of residential neighborhoods and supporting components such as parks, schools, and small retail shops.

 

Project Description

This project will construct safety improvements along the East Portland Ave corridor. The project includes removing and replacing existing traffic signal heads, pedestrian signal heads, pedestrian pushbuttons, junction boxes, and traffic controller cabinets, traffic signal poles, rewiring of existing traffic signals systems, removal and replacement of traffic islands and curb ramps, and installing channelization.

Below are the intersection included in this project.

  • East Portland Ave and Puyallup
  • East Portland and East 31st
  • East Portland and East 32nd
  • East Portland and East Fairbanks
  • East Portland and East 38th
  • East Portland and East 40th
  • East Portland and East 44th
  • East Portland and East 48th
  • East Portland and East 56th
  • East Portland and East 64th
  • East Portland and East 72nd

Here is the project’s construction limits:

Map

 

Project Schedule

Construction is expected to begin in March 2021 and last approximately 6-7 months.

 
Project Outreach

Informational flyers will be sent to all residents and businesses in the area notifying them of the pending construction.  Notification will also be provided via social media and this website. Seven days before the start of construction, electronic message boards will be placed along the corridor notifying drivers of the pending work.

 

Project Funding

Source Amount
Streets Initiative Funding $131,742
Other Local Contributions      $1,275,000
Federal Grant $2,379,703
Total Project Cost $3,786,445    

 

Additional Information

For additional project information contact Darius Thompson, Project Manager, at (253) 573-2410 or by email.



]]>